Spell checked non-source documentation pages.
This commit is contained in:
parent
663f449c10
commit
619b0b7b6b
27 changed files with 100 additions and 99 deletions
|
@ -15,7 +15,7 @@
|
|||
* hogs the processor, preventing another from running before some sort of timeout is exceeded). Unlike normal RTOS
|
||||
* tasks, each LUFA scheduler task is a regular function, and thus must be designed to be called, and designed to
|
||||
* return to the calling scheduler function repeatedly. Data which must be preserved between task calls should be
|
||||
* declared as global or (prefferably) as a static local variable inside the task.
|
||||
* declared as global or (preferably) as a static local variable inside the task.
|
||||
*
|
||||
* The scheduler consists of a task list, listing all the tasks which can be executed by the scheduler. Once started,
|
||||
* each task is then called one after another, unless the task is stopped by another running task or interrupt.
|
||||
|
|
Loading…
Add table
Add a link
Reference in a new issue